Our Production

Components

About us

Sustainability

Contact

Zero inventory cost

Zero pre-production cost

Less production operations

We increase

Boat Production Profitability

1

less production operations

2

zero pre-production cost

3

zero inventory cost

1

Less production operations

less unproductive work time

no time for assembling parts together

quick and easy "just plug it" type of job

2

Zero

pre-production cost

no work for hose measuring & cutting

no work for clamp collecting & installing

no cost of labor, working station or tools

3

Zero

inventory cost

no overstock, scrap & disposal cost

no overconsumption of goods

posponded payment with JIT delivery

We prepare a dedicated version of the configurator tailored to your needs

Resume

3 reasons to start the revolution

1

Production

Less unproductive operations

Expected

operations to cut

0

%

2

Pre-production

Eliminate unnecessary operations

Expected cost in

purchasing value

0

%

3

Purchasing

Eliminate any overstock

Expected cost in

purchasing value

0

%

Typical waste reality

and examples of its elimination with smart OEM kits

Order quantity based on BOM

The BOM contains many inconsistent hose section lengths and must be purchased with a overstock. Smart OEM kits allow the BOM to be adjusted and updated within an optimal timeframe.

10%+

Overstock

Cost of ordering hoses in coils

Hoses are bought in coils, not by centimeters are creating overstock and waste. Smart OEM kits are cut to the centimeter, eliminating purchase overstock and cutting waste.

20%+

Waste

Time for ordering hoses in coils

Hoses in coils must be purchased well in advance, tying up capital for longer periods.

Smart OEM kits can be delivered Just in Time, in accordance with the production schedule.

Cutting hoses by warehouse staff

Less hose waste, but production staff lose time identifying the correct hose sections. Smart OEM kits are already cut to length, and the labeling system eliminates identification time.

50%+

Waste

Cutting hoses by production staff

Less time spent identifying the right hose sections, but it creates more waste and lacks usage control.

10%+

Waste

Cutting the hoses manually

Employee cost, tools, hose-cutting station, waste, and disposal account for 60%+ of the hose purchase cost. Smart OEM kits are ready for assembly, eliminating the cost of labor, waste, tools, and workstation.

60%+

Hose purchase cost

Hose cost in yacht cost vs hose processing time

in build time

Hoses are a low-cost component (0.2% of yacht price) with high processing costs (around 3% of build time). Smart OEM kits are slightly more expensive than coils, but their installation time is much shorter.

50%+

Instalation time

Too long and too frequent assembly interruptions

Hoses in coils generate twice as much time for searching and preparation as for the assembly itself. Smart OEM kits reduce work interruptions; hoses are labeled, ready to connect, and bundled together.

100%+

Instalation time

Too many miastakes and too big cost of fixing them

Assembling parts together by production staff generates a risk of incorrect selection and installation. Smart OEM Kit components are properly selected, installed, and labeled, e.g., clamps for the hose DN.

Longer training time for a new employee

They need about 3 months to reach an adequate work pace, and they change jobs after 15 months. Smart OEM Kits are labeled hoses with installation instructions designed mainly for inexperienced workers.

NOT FOR WHOM?

Production is always based on custom designs, each boat with different construction, length, and width. Production volume: a few units per year.

TCO Report first

We provide the real savings value,

you make the purchasing decision

Statistic boat

Lenght

12.45 mt

Cabins/people

2/10

Fuel tank

300 l

Water tank

400 l

Engines

2x75 HP

Max speed

25 knots

Production a year

200 boats

Statistic components

Fuel hoses

16.15 mt

Water hoses

104.45 mt

Sanitary hoses

24.03 mt

Ventilation hoses

4.80 mt

Total hoses

167 .03 mt

Total hose price

767.48 €

Total clamp price

85.82€

Statistic work

Hose sections (pc)

64

Hose operations

285

Clamps (pc)

256

Clamp operations

774

Total operations

1.059

Statistic TCO figures

Hose & clamp overstock

78.954,90 €

32% more vs BOM

Hose & clamp operation cost

108.225,50€

66% more vs purchase value

Hose & clamp customer stock value

27.438,06 €

17% more vs purchase value

Total hidden stock

187.180,40 €

116% more vs purchase value

Hose & clamp price in boat price

0.2%

Hose & clamp operations in total boat operations:

3%

Hose precission cut to length:

up to 1 cm

3%

up to 5 cm

8%

up to 10 cm

16%

over to 10 cm

76%

Data speaks for itself

Statistic order

Coils

smart OEM kits.

Hose sections

x

800

Number of coils

54

x

Total length required

1 800 mt

1 378 mt

Total weight of coils

963 kg

702 kg

Number of operations

17 078

0

Total hose cost  

5.975 € (coils)

4.716 € (cm)

+ Cost of operations

17 078

0

Statistical workforce problems:

Number of educated employees

40%

Time needed for job preperation

3 months

Time they are leaving company

15 months

Communication in local language

80%

Statistical pre-production

Coils

smart OEM kits.

Hose coils to unwrap

54

0

Lenght measurement

800

0

Cutting operations

800

0

Hose spiral cutting

700

0

Spiral trimming

1 400

0

Fitting taking

627

0

Fitting inserting   

627

0

Clamp taking

3 200

0

Clamp inserting

3 200

0

Clamp screwing

3 200

0

Plug inserting

3 200

0

Total operations

17 078

0

No risky implementation process

You don't take any risk until you find out that it's a good solution for you. We always apply this rule when the client is not ready

to make a decision.

1

We provide hose samples and certificates for the marine market, first

We have over 25 years of experience in the maritime market. Each hose is used by leading European boat manufacturers. Each of the offered hoses has appropriate certificates.

2

We take responsibility for measuring the correct lengths of hoses

We can send our own team to take length measurements.

We assume the responsibility and costs of measurement operations.

Any mistakes will never be at your expense.

3

We make the first kit for each boat free of charge

There are discrepancies in the length of the hoses when assembling

the first boat of a new design. We will prepare a free set according

to the dimensions given in the project to make adjustments in reality. Only after making corrections, our production documentation is created.

4

We will be present when the first kits are installed.

When installing a free kit, we do more than just detect possible irregularities. We check whether the hose markings are clear to all employees and whether they speed up their work? If any doubts arise, we redesign the marking systems to make them more understandable.

5

We will secure a stock for you so that deliveries are on time.

All our suppliers are involved in the smart OEM kits project.

They secure product availability, for example through consignment warehouses.We provide customers with an e-solution so that they can control the security of goods for their needs.

6

We will use up your hoses first, then ours.

Switching to smart OEM kits has no additional costs for our customers. Every customer who decided on smart OEM kits had their own supplies. We use them first so that customers can release their funds.

After sales

service design

Below is one of the projects implemented to improve work

quality in the warehouse dpt.

Warehouse

Purchasing

Accounting

Producton

Quality controll

1

Packing list on the pallet for faster checking

2

Extra black foil on the top against rain

3

Transparent foil instead of black for faster box identification

4

Packing pallets by sets (green/red)

Separate packing for different facilities

5

Less hoses out of the box

6

Cross taping the box

7

Bundling by ties not by foil

Ready to join the revolution?

Contact us

About us

Types

Components

Production

Standards

Sustainability

EKO INDUSTRIE

ul. Przemysłowa 34B

76-200 Słupsk, Poland

e-mail: info@eko-industrie.com

phone: (+48) 598 481 710

VAT: PL 839 320 81 72

DUNS: 85 065 4073

eko industrie.

Sati Assembling Center Europe